Toyota Tundra Service Manual: Inspection

INSPECTION

PROCEDURE

1. INSPECT IGNITION SWITCH ASSEMBLY

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Switch Condition

Specified Condition

All terminals

LOCK

10 kΩ or higher

2 (ACC) - 4 (AM1)

ACC

Below 1 Ω

1 (IG1) - 4 (AM1)

ON

2 (ACC) - 4 (AM1)

5 (AM2) - 6 (IG2)

1 (IG1) - 4 (AM1)

START

3 (ST1) - 4 (AM1)

5 (AM2) - 6 (IG2)

5 (AM2) - 7 (ST2)

If the result is not as specified, replace the ignition switch assembly.

    Components

    Installation

    See More:

    Toyota Tundra Service Manual > Network Gateway Ecu: Installation
    INSTALLATION CAUTION / NOTICE / HINT HINT: A bolt without a torque specification is shown in the standard bolt chart. Click here PROCEDURE 1. INSTALL NETWORK GATEWAY ECU (a) for Floor Shift Type: (1) Install the network gateway ECU with the 2 nuts. Torque: 7.5 N·m {76 kgf·cm, 66 in·lbf} (2) Conne ...

    Toyota Tundra Owners Manual

    Toyota Tundra Service Manual

    © 2025 Copyright www.ttundra.com
    0.0129