INSTALLATION PROCEDURE 1. INSTALL IGNITION SWITCH ASSEMBLY
2. INSTALL UPPER STEERING COLUMN WITH SWITCH BRACKET ASSEMBLY (for Manual Tilt) 3. INSTALL UPPER STEERING COLUMN WITH SWITCH BRACKET ASSEMBLY (for Manual Tilt and Manual Telescopic Steering Column) 4. INSTALL STEERING COLUMN ASSEMBLY (a) for Manual Tilt: (See page (b) for Manual Tilt and Manual Telescopic Steering Column: (See page
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
Toyota Tundra Service Manual > Seat Belt Warning System: Terminals Of Ecu
TERMINALS OF ECU 1. CHECK COMBINATION METER ASSEMBLY (a) Disconnect the J28 combination meter assembly connector. (b) Disconnect the J28 combination meter assembly connector. (c) Measure the resistance and voltage according to the value(s) in the table below. Terminal No. (Symbol) Wiring Color Termi ...