REMOVAL PROCEDURE 1. PRECAUTION NOTICE: After
turning the ignition switch off, waiting time may be required before
disconnecting the cable from the battery terminal. Therefore, make sure
to read the disconnecting the cable from the battery terminal notice
before proceeding with work (See page 2. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL 3. REMOVE EXHAUST MANIFOLD SUB-ASSEMBLY RH (See page
4. REMOVE STARTER COVER
5. REMOVE STARTER ASSEMBLY
(b) Disconnect the starter connector. (c) Remove the nut and disconnect the starter wire.
|
Toyota Tundra Service Manual > Air Switching Valve(for Bank 2): Installation
INSTALLATION PROCEDURE 1. INSTALL AIR SWITCHING VALVE ASSEMBLY (a) Install a new gasket and the air switching valve assembly with the 3 bolts. Torque: 24 N·m {245 kgf·cm, 18 ft·lbf} Text in Illustration *1 Air Switching Valve Assembly *2 No. 3 Air Tube *a Claw NOTICE: Make sure the gasket's claws ...