ON-VEHICLE INSPECTION PROCEDURE 1. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY (a) Apply the parking brake and turn the ignition switch to ON. (b) Depress the brake pedal and check that the engine starts when the shift lever is in N or P, but does not start when the shift lever is in other positions. (c) Check that the back-up light illuminates and the reverse warning buzzer sounds when the shift lever is in R, but do not function when the shift lever is in other positions. |
Toyota Tundra Service Manual > Network Gateway Ecu: Installation
INSTALLATION CAUTION / NOTICE / HINT HINT: A bolt without a torque specification is shown in the standard bolt chart. Click here PROCEDURE 1. INSTALL NETWORK GATEWAY ECU (a) for Floor Shift Type: (1) Install the network gateway ECU with the 2 nuts. Torque: 7.5 N·m {76 kgf·cm, 66 in·lbf} (2) Conne ...