INSTALLATION PROCEDURE 1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
(b) Fully tighten the 4 bolts in the order shown in the illustration. Torque: 14 N·m {143 kgf·cm, 10 ft·lbf} (c) Connect the clamp and 2 connectors.
2. INSTALL NO. 1 CONSOLE BOX DUCT (w/ Rear Air Duct) (a) Install the No. 1 console box duct with the 2 clips. 3. ADJUST SHIFT LEVER POSITION 4. INSPECT SHIFT LEVER POSITION 5. INSTALL CONSOLE BOX ASSEMBLY (See page
|
Toyota Tundra Service Manual > Center Power Outlet Socket(for Floor Shift Type): Installation
INSTALLATION PROCEDURE 1. INSTALL POWER OUTLET SOCKET COVER (for Double Cab) (a) Attach the 2 claws to install the power outlet socket cover. 2. INSTALL POWER OUTLET SOCKET ASSEMBLY (for Double Cab) (a) Attach the claw to install the power outlet socket assembly. 3. INSTALL REAR CONSOLE END PANEL SU ...