INSTALLATION PROCEDURE 1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
(b) Fully tighten the 4 bolts in the order shown in the illustration. Torque: 14 N·m {143 kgf·cm, 10 ft·lbf} (c) Connect the clamp and 2 connectors.
2. INSTALL NO. 1 CONSOLE BOX DUCT (w/ Rear Air Duct) (a) Install the No. 1 console box duct with the 2 clips. 3. ADJUST SHIFT LEVER POSITION 4. INSPECT SHIFT LEVER POSITION 5. INSTALL CONSOLE BOX ASSEMBLY (See page
|
Toyota Tundra Service Manual > Pre-collision System Warning Buzzer: Installation
INSTALLATION PROCEDURE 1. INSTALL SKID CONTROL BUZZER ASSEMBLY (a) Connect the connector. NOTICE: Securely connect the connector. (b) Attach the clamp to install the skid control buzzer assembly. NOTICE: Securely insert the clamp into the bracket of the instrument panel reinforcement. If the buzzer ...