INSPECTION PROCEDURE 1. INSPECT FRONT NO. 1 SUSPENSION ARM LOWER SUB-ASSEMBLY LH (a) As shown in the illustration, move the ball joint stud back and forth 5 times before installing the nut. (b) Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per turn and take the torque reading on the fifth turn. Standard turning torque: 3.0 to 10.0 N*m (31 to 102 kgf*cm, 27 to 89 in.*lbf) (c) Check for any cracks and grease leaks on the ball joint dust cover. |
Toyota Tundra Service Manual > Roof Drip Side Finish Moulding: Removal
REMOVAL CAUTION / NOTICE / HINT HINT: Use the same procedures for the RH side and LH side. The procedures listed below are for the LH side. When removing the moulding, heat the vehicle body and moulding using a heat light. When replacing a clip, heat the vehicle body and clip using a heat light. Sta ...