REASSEMBLY PROCEDURE 1. INSTALL FRONT NO. 1 SPRING BUMPER LH (a) Install the No. 1 spring bumper to the vehicle. Torque: 31 N·m {316 kgf·cm, 23 ft·lbf} 2. INSTALL FRONT NO. 2 LOWER ARM LH (a) Using SST and a press, press in a new bush. SST: 09710-26011 09710-05081 NOTICE: Press the bush while making sure the bush positioning protrusions are perpendicular to the lower arm, as shown in the illustration. 3. INSTALL FRONT NO. 1 LOWER ARM BUSH LH (a) Using SST and a press, press in a new bush. SST: 09223-00010 SST: 09612-30012 4. INSTALL FRONT LOWER BALL JOINT ATTACHMENT LH (a) Install the attachment with the nut and a new cotter pin. Torque: 167 N·m {1703 kgf·cm, 123 ft·lbf} NOTICE: If the holes for the cotter pin are not aligned, tighten the nut further up to 60°. |
Toyota Tundra Service Manual > Air Switching Valve(for Bank 2): Inspection
INSPECTION PROCEDURE 1. INSPECT AIR SWITCHING VALVE ASSEMBLY (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition 1 - 5 20°C (68°F) 4.5 to 5.5 Ω 1 - Body ground Always 1 MΩ or higher 5 - Body ground Text in ...