INSTALLATION PROCEDURE 1. INSTALL POWER OUTLET SOCKET COVER (for Double Cab)
2. INSTALL POWER OUTLET SOCKET ASSEMBLY (for Double Cab)
3. INSTALL REAR CONSOLE END PANEL SUB-ASSEMBLY (for Double Cab)
4. INSTALL POWER OUTLET SOCKET COVER
5. INSTALL POWER OUTLET SOCKET ASSEMBLY
6. INSTALL CONSOLE BOX BEZEL
(b) Connect the connector. 7. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
8. INSTALL UPPER REAR CONSOLE PANEL SUB-ASSEMBLY
|
Toyota Tundra Service Manual > Power Window Control System(w/o Jam Protection Function): Terminals Of Ecu
TERMINALS OF ECU 1. CHECK POWER WINDOW REGULATOR MASTER SWITCH ASSEMBLY (a) Disconnect the N2 master switch connector. (b) Measure the resistance and voltage according to the value(s) in the table below. for Double Cab: Terminal No. (Symbol) Wiring Color Terminal Description Condition Specified Cond ...