INSTALLATION PROCEDURE 1. INSTALL STEREO COMPONENT TUNER ASSEMBLY
2. INSTALL NO. 2 RADIO RECEIVER BRACKET (a) Install the No. 2 radio receiver bracket with the 5 bolts. Torque: 3.5 N·m {36 kgf·cm, 31 in·lbf} 3. INSTALL NO. 1 RADIO RECEIVER BRACKET (a) Install the No. 1 radio receiver bracket with the 5 bolts. Torque: 3.5 N·m {36 kgf·cm, 31 in·lbf} 4. INSTALL NO. 1 NAVIGATION WIRE (a) Connect each connector to install the No. 1 navigation wire. 5. INSTALL RADIO AND DISPLAY RECEIVER ASSEMBLY
6. INSTALL AIR CONDITIONING CONTROL ASSEMBLY
7. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
8. INSTALL REAR UPPER CONSOLE PANEL SUB-ASSEMBLY
9. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ). |
Toyota Tundra Service Manual > Lin Communication System: Integration Control and Panel Assembly Communication Error
DESCRIPTION The LIN communication of the components related to the mirror heater occurs between the air conditioning amplifier assembly and air conditioning control assembly. WIRING DIAGRAM CAUTION / NOTICE / HINT NOTICE: When using the Techstream with the ignition switch OFF to troubleshoot: Connec ...