INSTALLATION PROCEDURE 1. INSTALL NAVIGATION ANTENNA ASSEMBLY (a) Attach the 2 guides to install the navigation antenna assembly. (b) Install the 2 screws. (c) Attach the 2 clamps. 2. INSTALL DEFROSTER NOZZLE ASSEMBLY
3. INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT
4. INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT
5. INSTALL NO. 2 HEATER TO REGISTER DUCT
6. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY (a) for Column Shift Type: (See page ) (b) for Floor Shift Type: (See page ) 7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ). 8. CHECK SRS WARNING LIGHT (See page ) |
Toyota Tundra Service Manual > Fog Light Assembly(for Led Fog Light): Installation
INSTALLATION CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH and LH sides. The procedure listed below is for the LH side. PROCEDURE 1. INSTALL FOG LIGHT ASSEMBLY LH (a) for Type A: (1) Attach the 2 guides to set the fog light assembly LH. (2) Install the screw. (b) for Type B: (1) At ...