Toyota Tundra Service Manual: Installation

INSTALLATION

PROCEDURE

1. INSTALL GENERATOR ASSEMBLY

(a) Install the generator with the 3 bolts and nut.

Torque:

43 N·m {438 kgf·cm, 32 ft·lbf}

(b) Install the harness bracket to the generator with the bolt.

Torque:

31 N·m {316 kgf·cm, 23 ft·lbf}

(c) Connect the generator connector.

(d) Connect the generator wire with the nut.

Torque:

9.8 N·m {100 kgf·cm, 87 in·lbf}

(e) Install the terminal cap.

2. CONNECT VANE PUMP ASSEMBLY

3. CONNECT POWER STEERING OIL PRESSURE SWITCH CONNECTOR

4. INSTALL FRONT FENDER APRON SEAL RH

5. INSTALL AIR CLEANER ASSEMBLY

6. INSTALL FAN AND GENERATOR V BELT

(a) Install the fan and generator V belt (See page ).

7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Inspection

    Reassembly

    See More:

    Toyota Tundra Service Manual > Can Communication System: Check Bus 5 Lines for Short Circuit
    DESCRIPTION There may be a short circuit between the CAN main bus lines and/or CAN branch lines when the resistance between terminals 15 (CA5H) and 16 (CA5L) of the central gateway ECU (network gateway ECU) is below 54 Ω. Symptom Trouble Area Resistance between terminals 15 (CA5H) and 16 (CA5L) of ...

    Toyota Tundra Owners Manual

    Toyota Tundra Service Manual

    © 2026 Copyright www.ttundra.com
    0.0172