INSTALLATION PROCEDURE 1. INSTALL GENERATOR ASSEMBLY
(c) Connect the generator connector. (d) Connect the generator wire with the nut. Torque: 9.8 N·m {100 kgf·cm, 87 in·lbf} (e) Install the terminal cap. 2. CONNECT VANE PUMP ASSEMBLY 3. CONNECT POWER STEERING OIL PRESSURE SWITCH CONNECTOR
4. INSTALL FRONT FENDER APRON SEAL RH 5. INSTALL AIR CLEANER ASSEMBLY 6. INSTALL FAN AND GENERATOR V BELT (a) Install the fan and generator V belt (See page
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
Toyota Tundra Service Manual > Can Communication System: Check Bus 5 Lines for Short Circuit
DESCRIPTION There may be a short circuit between the CAN main bus lines and/or CAN branch lines when the resistance between terminals 15 (CA5H) and 16 (CA5L) of the central gateway ECU (network gateway ECU) is below 54 Ω. Symptom Trouble Area Resistance between terminals 15 (CA5H) and 16 (CA5L) of ...