INSTALLATION PROCEDURE 1. INSTALL GENERATOR ASSEMBLY
(c) Connect the generator connector. (d) Connect the generator wire with the nut. Torque: 9.8 N·m {100 kgf·cm, 87 in·lbf} (e) Install the terminal cap. 2. CONNECT VANE PUMP ASSEMBLY 3. CONNECT POWER STEERING OIL PRESSURE SWITCH CONNECTOR
4. INSTALL FRONT FENDER APRON SEAL RH 5. INSTALL AIR CLEANER ASSEMBLY 6. INSTALL FAN AND GENERATOR V BELT (a) Install the fan and generator V belt (See page
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
Toyota Tundra Service Manual > Front Lower Suspension Arm: Inspection
INSPECTION PROCEDURE 1. INSPECT FRONT NO. 1 SUSPENSION ARM LOWER SUB-ASSEMBLY LH (a) As shown in the illustration, move the ball joint stud back and forth 5 times before installing the nut. (b) Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per turn and take the torque ...