INSTALLATION PROCEDURE 1. INSTALL GENERATOR ASSEMBLY
(c) Connect the generator connector. (d) Connect the generator wire with the nut. Torque: 9.8 N·m {100 kgf·cm, 87 in·lbf} (e) Install the terminal cap. 2. CONNECT VANE PUMP ASSEMBLY 3. CONNECT POWER STEERING OIL PRESSURE SWITCH CONNECTOR
4. INSTALL FRONT FENDER APRON SEAL RH 5. INSTALL AIR CLEANER ASSEMBLY 6. INSTALL FAN AND GENERATOR V BELT (a) Install the fan and generator V belt (See page
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
Toyota Tundra Service Manual > Pre-collision System: Brake Control Signal Mismatch (C1A69)
DESCRIPTION The skid control ECU (brake actuator assembly) sends signals to the millimeter wave radar sensor assembly according to the brake control status. If the millimeter wave radar sensor assembly receives a vehicle stability control system malfunction signal from the skid control ECU (brake ac ...