INSTALLATION PROCEDURE 1. INSTALL CANISTER PUMP MODULE
2. INSTALL CHARCOAL CANISTER ASSEMBLY (a) Install the charcoal canister assembly with the 4 bolts. Torque: 29 N·m {296 kgf·cm, 21 ft·lbf} (b) Attach the wire harness clamp. ![]() (c) Connect the vent line hose. (1) Push the vent line hose into the port and push the retainer to lock it. Text in Illustration
NOTICE:
(d) Connect the air inlet line hose. NOTICE:
(e) Connect the purge line hose and slide the clamp to secure the hose. (f) Connect the canister pump module connector. (g) Connect the wiring harness clamp bracket with the nut. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} |
Toyota Tundra Service Manual > Power Outlet Socket: Removal
REMOVAL PROCEDURE 1. REMOVE LOWER CENTER INSTRUMENT COVER (for Column Shift Type) 2. REMOVE SHIFT LEVER KNOB SUB-ASSEMBLY (for Floor Shift Type) 3. REMOVE UPPER REAR CONSOLE PANEL SUB-ASSEMBLY (for Floor Shift Type) 4. REMOVE UPPER CONSOLE PANEL SUB-ASSEMBLY (for Floor Shift Type) 5. REMOVE REAR CON ...