INSTALLATION PROCEDURE 1. INSTALL EGR VALVE BRACKET
2. INSTALL NO. 3 EGR PIPE SUB-ASSEMBLY
3. INSTALL EGR INLET
4. INSTALL EGR VALVE ASSEMBLY
5. CONNECT NO. 13 WATER BY-PASS HOSE
6. CONNECT NO. 12 WATER BY-PASS HOSE
7. INSTALL AIR CLEANER HOSE ASSEMBLY 8. ADD ENGINE COOLANT 9. INSPECT FOR ENGINE COOLANT LEAK 10. INSTALL V-BANK COVER SUB-ASSEMBLY |
Toyota Tundra Service Manual > Power Door Lock Control System: Customize Parameters
CUSTOMIZE PARAMETERS PROCEDURE 1. CUSTOMIZE POWER DOOR LOCK CONTROL SYSTEM (a) Customizing with the Techstream HINT: The following items can be customized. NOTICE: When the customer requests a change in a function, first make sure that the function can be customized. Be sure to make a note of the cu ...