Components COMPONENTS ILLUSTRATION ![]() Inspection INSPECTION PROCEDURE 1. INSPECT PURGE VSV ![]() (a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
If the result is not as specified, replace the purge VSV. (b) Inspect the purge VSV operation. ![]() (1) Check that air does not flow from ports.
(3) Check that air flows from ports. If the result is not as specified, replace the purge VSV. Installation INSTALLATION PROCEDURE 1. INSTALL PURGE VSV
(b) Connect the connector. 2. CONNECT PURGE LINE HOSE (a) Connect the 2 hoses. HINT: Turn the claw of the clip to the upper side. 3. INSTALL V-BANK COVER SUB-ASSEMBLY Removal REMOVAL PROCEDURE 1. REMOVE V-BANK COVER SUB-ASSEMBLY 2. DISCONNECT PURGE LINE HOSE (a) Disconnect the 2 purge line hoses. 3. REMOVE PURGE VSV
(b) Remove the bolt and purge VSV. |
Toyota Tundra Service Manual > Camshaft(for Bank 1): Removal
REMOVAL PROCEDURE 1. REMOVE TIMING CHAIN COVER SUB-ASSEMBLY (a) Remove the timing chain cover (See page ). 2. SET NO. 1 CYLINDER TO TDC / COMPRESSION 3. REMOVE NO. 1 CHAIN TENSIONER ASSEMBLY LH (a) Move the stopper plate upward to release the lock, and push the plunger deep into the tensioner. (b) M ...