On-vehicle Inspection ON-VEHICLE INSPECTION PROCEDURE 1. REMOVE V-BANK COVER SUB-ASSEMBLY 2. INSPECT VACUUM SWITCHING VALVE ASSEMBLY (for ACIS) (a) Disconnect the vacuum switching valve connector.
(c) Check the vacuum switching valve operation.
(3) When applying a vacuum to port F, check that air is sucked into port E. If the result is not as specified, replace the vacuum switching valve assembly. (d) Connect the vacuum switching valve connector. 3. INSTALL V-BANK COVER SUB-ASSEMBLY |
Toyota Tundra Service Manual > Front Passenger Airbag Assembly: Installation
INSTALLATION PROCEDURE 1. INSTALL FRONT PASSENGER AIRBAG ASSEMBLY (a) Attach the 5 hooks (A). (b) Attach the 5 hooks (B) and install the front passenger airbag on the instrument panel. (c) Install the 2 screws. 2. INSTALL NO. 3 INSTRUMENT PANEL WIRE (a) Attach the wire harness clamp to install the N ...