INSTALLATION PROCEDURE 1. INSTALL IGNITION SWITCH ASSEMBLY
2. INSTALL UPPER STEERING COLUMN WITH SWITCH BRACKET ASSEMBLY (for Manual Tilt) 3. INSTALL UPPER STEERING COLUMN WITH SWITCH BRACKET ASSEMBLY (for Manual Tilt and Manual Telescopic Steering Column) 4. INSTALL STEERING COLUMN ASSEMBLY (a) for Manual Tilt: (See page (b) for Manual Tilt and Manual Telescopic Steering Column: (See page
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
Toyota Tundra Service Manual > 1ur-fe Fuel: Fuel Sender Gauge Assembly
ComponentsCOMPONENTS ILLUSTRATION InspectionINSPECTION PROCEDURE 1. INSPECT FUEL SENDER GAUGE ASSEMBLY (a) Check that the float moves smoothly between F and E. (b) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Conditi ...