Toyota Tundra Service Manual: Installation

INSTALLATION

PROCEDURE

1. INSTALL TRANSFER POSITION SWITCH

(a) Attach the 2 claws to install the transfer position switch.

2. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY

  • for Column Shift Type: (See page )
  • for Floor Shift Type: (See page )
    Components

    On-vehicle Inspection

    See More:

    Toyota Tundra Service Manual > Air Switching Valve(for Bank 1): Installation
    INSTALLATION PROCEDURE 1. INSTALL AIR SWITCHING VALVE ASSEMBLY (a) Install a new gasket and the air switching valve assembly with the 3 bolts. Torque: 24 N·m {245 kgf·cm, 18 ft·lbf} Text in Illustration *1 Air Switching Valve Assembly *2 No. 4 Air Tube *a Claw NOTICE: Make sure the gasket's claws ...

    Toyota Tundra Owners Manual

    Toyota Tundra Service Manual

    © 2026 Copyright www.ttundra.com
    0.0335