INSTALLATION PROCEDURE 1. INSTALL STEREO COMPONENT TUNER ASSEMBLY (w/ Satellite Radio) 2. INSTALL NO. 2 RADIO RECEIVER BRACKET (a) w/o Satellite Radio: Install the No. 2 radio receiver bracket with the 3 bolts. Torque: 3.5 N·m {36 kgf·cm, 31 in·lbf} (b) w/ Satellite Radio: Install the No. 2 radio receiver bracket with the 5 bolts. Torque: 3.5 N·m {36 kgf·cm, 31 in·lbf} 3. INSTALL NO. 1 RADIO RECEIVER BRACKET (a) w/o Satellite Radio: Install the No. 1 radio receiver bracket with the 3 bolts. Torque: 3.5 N·m {36 kgf·cm, 31 in·lbf} (b) w/ Satellite Radio: Install the No. 1 radio receiver bracket with the 5 bolts. Torque: 3.5 N·m {36 kgf·cm, 31 in·lbf} 4. INSTALL NO. 1 NAVIGATION WIRE (w/ Satellite Radio) 5. INSTALL RADIO AND DISPLAY RECEIVER ASSEMBLY (a) Connect each connector. (b) Insert the radio and display receiver assembly with bracket and attach the 2 guides and 3 clips on its backside. NOTICE: When inserting the radio receiver, do not press its knobs. (c) Install the radio and display receiver assembly with bracket with the 4 bolts. Torque: 5.5 N·m {56 kgf·cm, 49 in·lbf} 6. INSTALL AIR CONDITIONING CONTROL ASSEMBLY 7. INSTALL CENTER LOWER INSTRUMENT COVER 8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page
|
Toyota Tundra Service Manual > Air Switching Valve(for Bank 1): Inspection
INSPECTION PROCEDURE 1. INSPECT AIR SWITCHING VALVE ASSEMBLY (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condition 1 - 5 20°C (68°F) 4.5 to 5.5 Ω 1 - Body ground Always 1 MΩ or higher 5 - Body ground Text in ...