Toyota Tundra Service Manual: Installation

INSTALLATION

PROCEDURE

1. INSTALL STARTER ASSEMBLY

(a) Install the flywheel housing side cover.

(b) Install the starter with the 2 bolts.

Torque:

37 N·m {377 kgf·cm, 27 ft·lbf}

(c) Connect the starter wire with the nut.

Torque:

9.8 N·m {100 kgf·cm, 87 in·lbf}

(d) Connect the starter connector.

(e) Attach the 2 wire harness clamps.

2. INSTALL STARTER COVER

(a) Install the starter cover with the 3 bolts.

Torque:

12 N·m {117 kgf·cm, 8 ft·lbf}

3. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH

(See page )

4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Inspection

    Reassembly

    See More:

    Toyota Tundra Service Manual > Navigation Receiver(for Floor Shift Type): Installation
    INSTALLATION PROCEDURE 1. INSTALL STEREO COMPONENT TUNER ASSEMBLY (w/ Satellite Radio) 2. INSTALL NO. 2 RADIO RECEIVER BRACKET (a) w/o Satellite Radio: Install the No. 2 radio receiver bracket with the 3 bolts. Torque: 3.5 N·m {36 kgf·cm, 31 in·lbf} (b) w/ Satellite Radio: Install the No. 2 radio ...

    Toyota Tundra Owners Manual

    Toyota Tundra Service Manual

    © 2026 Copyright www.ttundra.com
    0.0126