Toyota Tundra Service Manual: Installation

INSTALLATION

PROCEDURE

1. INSTALL STARTER ASSEMBLY

(a) Install the flywheel housing side cover.

(b) Install the starter with the 2 bolts.

Torque:

37 N·m {377 kgf·cm, 27 ft·lbf}

(c) Connect the starter wire with the nut.

Torque:

9.8 N·m {100 kgf·cm, 87 in·lbf}

(d) Connect the starter connector.

(e) Attach the 2 wire harness clamps.

2. INSTALL STARTER COVER

(a) Install the starter cover with the 3 bolts.

Torque:

12 N·m {117 kgf·cm, 8 ft·lbf}

3. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH

(See page )

4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Inspection

    Reassembly

    See More:

    Toyota Tundra Service Manual > Instrument Panel Safety Pad(for Column Shift Type): Installation
    INSTALLATION CAUTION / NOTICE / HINT HINT: A bolt without a torque specification is shown in the standard bolt chart. Click here PROCEDURE 1. INSTALL NO. 1 INSTRUMENT PANEL CLIP (a) Attach the 2 claws to install the 2 No. 1 instrument panel clips. 2. INSTALL NO. 3 INSTRUMENT PANEL STAY (a) Attach th ...

    Toyota Tundra Owners Manual

    Toyota Tundra Service Manual

    © 2026 Copyright www.ttundra.com
    0.0371