INSTALLATION PROCEDURE 1. INSTALL STARTER ASSEMBLY (a) Install the flywheel housing side cover. (b) Install the starter with the 2 bolts. Torque: 37 N·m {377 kgf·cm, 27 ft·lbf} (c) Connect the starter wire with the nut. Torque: 9.8 N·m {100 kgf·cm, 87 in·lbf} (d) Connect the starter connector. (e) Attach the 2 wire harness clamps. 2. INSTALL STARTER COVER (a) Install the starter cover with the 3 bolts. Torque: 12 N·m {117 kgf·cm, 8 ft·lbf} 3. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH (See page 4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
Toyota Tundra Service Manual > Steering Column Assembly(for Power Tilt And Power Telescopic Steering Column): Components
COMPONENTS ILLUSTRATION *1 COWL SIDE TRIM BOARD LH *2 FRONT DOOR SCUFF PLATE LH *3 INSTRUMENT SIDE PANEL LH *4 LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY LH *5 LOWER NO. 1 INSTRUMENT PANEL AIRBAG ASSEMBLY *6 NO. 3 AIR DUCT SUB-ASSEMBLY *7 HOOD LOCK CONTROL LEVER - - N*m (kgf*cm, ft.*lbf): Spec ...