INSTALLATION PROCEDURE 1. INSTALL STARTER ASSEMBLY (a) Install the flywheel housing side cover. (b) Install the starter with the 2 bolts. Torque: 37 N·m {377 kgf·cm, 27 ft·lbf} (c) Connect the starter wire with the nut. Torque: 9.8 N·m {100 kgf·cm, 87 in·lbf} (d) Connect the starter connector. (e) Attach the 2 wire harness clamps. 2. INSTALL STARTER COVER (a) Install the starter cover with the 3 bolts. Torque: 12 N·m {117 kgf·cm, 8 ft·lbf} 3. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH (See page 4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
Toyota Tundra Service Manual > Instrument Panel Safety Pad(for Column Shift Type): Installation
INSTALLATION CAUTION / NOTICE / HINT HINT: A bolt without a torque specification is shown in the standard bolt chart. Click here PROCEDURE 1. INSTALL NO. 1 INSTRUMENT PANEL CLIP (a) Attach the 2 claws to install the 2 No. 1 instrument panel clips. 2. INSTALL NO. 3 INSTRUMENT PANEL STAY (a) Attach th ...