Toyota Tundra Service Manual: Installation

INSTALLATION

PROCEDURE

1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY

(a) Install the switch to the manual valve shaft.

(b) Temporarily install the bolt.

(c) Install a new lock washer and the nut.

Torque:

6.9 N·m {70 kgf·cm, 61 in·lbf}

(d) Temporarily install the control shaft lever RH.

(e) Turn the control shaft lever RH counterclockwise until it stops, and then turn it clockwise 2 notches to set it to the N position.

(f) Align the groove with the neutral basic line.

(g) Hold the switch in position and tighten the bolt.

Torque:

13 N·m {130 kgf·cm, 9 ft·lbf}

(h) Using a screwdriver, bend the tabs of the lock washer.

(i) Install the transmission control shaft lever RH with the spring washer and nut.

Torque:

16 N·m {160 kgf·cm, 12 ft·lbf}

(j) Connect the switch connector.

2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY

(a) Connect the cable with the nut.

Torque:

13 N·m {133 kgf·cm, 10 ft·lbf}

NOTICE:

When connecting the cable to the transmission control shaft lever, make sure the L bracket of the cable faces the inside of the vehicle.

3. ADJUST SHIFT LEVER POSITION (for Column Shift Type)

4. ADJUST SHIFT LEVER POSITION (for Floor Shift Type)

5. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY

(a) Inspect the switch (See page ).

    Inspection

    On-vehicle Inspection

    See More:

    Toyota Tundra Service Manual > 1ur-fe Intake: Intake System
    On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. INSPECT INTAKE AIR CONTROL VALVE (a) Remove the V-bank cover. (b) Start the engine. (c) While the engine is idling, check that the actuator rod moves as shown in the illustration. (d) Disconnect the VSV connector, and check that the actuator r ...

    Toyota Tundra Owners Manual

    Toyota Tundra Service Manual

    © 2021 Copyright www.ttundra.com
    0.0219