INSTALLATION PROCEDURE 1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY (a) Install the switch to the manual valve shaft.
(g) Hold the switch in position and tighten the bolt. Torque: 13 N·m {130 kgf·cm, 9 ft·lbf}
(j) Connect the switch connector. 2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY (a) Connect the cable with the nut. Torque: 13 N·m {133 kgf·cm, 10 ft·lbf} NOTICE: When connecting the cable to the transmission control shaft lever, make sure the L bracket of the cable faces the inside of the vehicle. 3. ADJUST SHIFT LEVER POSITION (for Column Shift Type) 4. ADJUST SHIFT LEVER POSITION (for Floor Shift Type) 5. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY (a) Inspect the switch (See page |
Toyota Tundra Service Manual > Power Door Lock Control System: Improper Operation
DESCRIPTION In cases where doors locked (lock) by themselves even though a door lock operation was not performed, possible causes include vehicle-side malfunction, environmental malfunction, or operation by the customer (including other passengers in the vehicle). By using the operation history, the ...