REASSEMBLY PROCEDURE 1. INSTALL FRONT UPPER BALL JOINT DUST COVER LH (a) Pack the upper arm ball joint with MP grease. Grease capacity: 5.0 to 7.0 g (0.176 to 0.247 oz.)
2. INSTALL FRONT SUSPENSION UPPER ARM BUSH (a) Using SST and a press, press in a new bush. SST: 09710-26011 09710-05061 |
Toyota Tundra Service Manual > Headlight Leveling Switch: Inspection
INSPECTION PROCEDURE 1. INSPECT HEADLIGHT LEVELING SWITCH (a) Check the voltage. (1) Connect the battery positive (+) lead to terminal 1 (B) and the negative (-) lead to terminal 5 (E). (2) Measure the voltage according to the value(s) in the table below. Standard Voltage: Tester Connection Switch C ...