Toyota Tundra Service Manual: Removal

REMOVAL

PROCEDURE

1. DISCONNECT NO. 2 AIR HOSE

(a) Disconnect the air switching valve assembly connector.

(b) Slide the clamp and disconnect the No. 2 air hose.

2. REMOVE AIR SWITCHING VALVE ASSEMBLY

(a) Remove the bolt and disconnect the wire harness clamp bracket from the cylinder head cover.

(b) Remove the 2 bolts.

(c) Remove the 3 bolts, air switching valve assembly and gasket.

NOTICE:

Be careful not to damage the installation surface of the gaskets.

    Installation

    Air Switching Valve(for Bank 2)

    See More:

    Toyota Tundra Service Manual > Air Switching Valve(for Bank 1): Installation
    INSTALLATION PROCEDURE 1. INSTALL AIR SWITCHING VALVE ASSEMBLY (a) Install a new gasket and the air switching valve assembly with the 3 bolts. Torque: 24 N·m {245 kgf·cm, 18 ft·lbf} Text in Illustration *1 Air Switching Valve Assembly *2 No. 4 Air Tube *a Claw NOTICE: Make sure the gasket's claws ...

    Toyota Tundra Owners Manual

    Toyota Tundra Service Manual

    © 2026 Copyright www.ttundra.com
    0.0326