Components COMPONENTS ILLUSTRATION ![]()
Inspection INSPECTION PROCEDURE 1. INSPECT HIGH PITCHED HORN ASSEMBLY ![]() (a) Apply battery voltage and check operation of the high pitched horn assembly, as shown in the table. OK:
If the result is not as specified, replace the high pitched horn assembly. Installation INSTALLATION PROCEDURE 1. INSTALL HIGH PITCHED HORN ASSEMBLY (a) Install the high pitched horn assembly with the bolt. Torque: 20 N·m {199 kgf·cm, 14 ft·lbf} (b) Connect the connector. 2. INSTALL RADIATOR GRILLE SUB-ASSEMBLY Click here Removal REMOVAL PROCEDURE 1. REMOVE RADIATOR GRILLE SUB-ASSEMBLY Click here 2. REMOVE HIGH PITCHED HORN ASSEMBLY ![]() (a) Disconnect the connector. (b) Remove the bolt and high pitched horn assembly. |
Toyota Tundra Service Manual > Propeller Shaft Assembly(for 4wd): Removal
REMOVAL PROCEDURE 1. REMOVE PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY (a) Place matchmarks on the propeller shaft flange and differential flange. Text in Illustration *a for Differential Side *b Matchmark (b) Remove the 4 bolts and 4 nuts. (c) w/o Bearing Washer: (1) Remove the 2 mounting bolts f ...