INSTALLATION PROCEDURE 1. INSTALL NAVIGATION ANTENNA ASSEMBLY (a) Attach the 2 guides to install the navigation antenna assembly. (b) Install the 2 screws. (c) Attach the 2 clamps. 2. INSTALL DEFROSTER NOZZLE ASSEMBLY
3. INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT 4. INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT 5. INSTALL NO. 2 HEATER TO REGISTER DUCT 6. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY (a) for Column Shift Type: (See page (b) for Floor Shift Type: (See page
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page
8. CHECK SRS WARNING LIGHT (See page |
Toyota Tundra Service Manual > 1ur-fe Lubrication: Oil Pressure Switch
ComponentsCOMPONENTS ILLUSTRATION InstallationINSTALLATION PROCEDURE 1. INSTALL OIL PRESSURE SENDER GAUGE ASSEMBLY (a) Apply adhesive to 2 or 3 threads of the oil pressure sender gauge. Adhesive: Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent (b) Install the oil pressure sender gauge. ...