INSTALLATION PROCEDURE 1. INSTALL NAVIGATION ANTENNA ASSEMBLY (a) Attach the 2 guides to install the navigation antenna assembly. (b) Install the 2 screws. (c) Attach the 2 clamps. 2. INSTALL DEFROSTER NOZZLE ASSEMBLY
3. INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT 4. INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT 5. INSTALL NO. 2 HEATER TO REGISTER DUCT 6. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY (a) for Column Shift Type: (See page (b) for Floor Shift Type: (See page
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page
8. CHECK SRS WARNING LIGHT (See page |
Toyota Tundra Service Manual > Sfi System: Fail-safe Chart
FAIL-SAFE CHART If any of the following DTCs are stored, the ECM enters fail-safe mode to allow the vehicle to be driven temporarily. DTC Component Fail-Safe Operation Fail-Safe Deactivation Condition P0011, P0021, P0015 and P0025 VVT system Idle up (Control of combustion worsening) Stopping fuel-cu ...