INSTALLATION PROCEDURE 1. INSTALL NAVIGATION ANTENNA ASSEMBLY (a) Attach the 2 guides to install the navigation antenna assembly. (b) Install the 2 screws. (c) Attach the 2 clamps. 2. INSTALL DEFROSTER NOZZLE ASSEMBLY
3. INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT
4. INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT
5. INSTALL NO. 2 HEATER TO REGISTER DUCT
6. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY (a) for Column Shift Type: (See page ) (b) for Floor Shift Type: (See page ) 7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ). 8. CHECK SRS WARNING LIGHT (See page ) |
Toyota Tundra Service Manual > Instrument Panel Speaker(for Crewmax): Installation
INSTALLATION PROCEDURE 1. INSTALL FRONT NO. 4 SPEAKER ASSEMBLY (for 12 Speakers) (a) Connect the connector. (b) Temporarily install the front No. 4 speaker assembly by aligning the positioning pins of the front No. 4 speaker assembly with the instrument panel. (c) Install the front No. 4 speaker ass ...