INSTALLATION PROCEDURE 1. INSTALL IGNITION SWITCH ASSEMBLY
2. INSTALL UPPER STEERING COLUMN WITH SWITCH BRACKET ASSEMBLY (for Manual Tilt) 3. INSTALL UPPER STEERING COLUMN WITH SWITCH BRACKET ASSEMBLY (for Manual Tilt and Manual Telescopic Steering Column) 4. INSTALL STEERING COLUMN ASSEMBLY (a) for Manual Tilt: (See page (b) for Manual Tilt and Manual Telescopic Steering Column: (See page
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
Toyota Tundra Service Manual > Can Communication System: Check Bus 2 Line for Short to +B
DESCRIPTION There may be a short circuit between one of the CAN bus lines and +B when there is no resistance between terminal 18 (CA4H) of the central gateway ECU (network gateway ECU) and terminal 16 (BAT) of the DLC3, or terminal 17 (CA4L) of the central gateway ECU (network gateway ECU) and termi ...