INSTALLATION PROCEDURE 1. INSTALL STARTER ASSEMBLY (a) Install the flywheel housing side cover. (b) Install the starter with the 2 bolts. Torque: 37 N·m {377 kgf·cm, 27 ft·lbf} (c) Connect the starter wire with the nut. Torque: 9.8 N·m {100 kgf·cm, 87 in·lbf} (d) Connect the starter connector. (e) Attach the 2 wire harness clamps. 2. INSTALL STARTER COVER (a) Install the starter cover with the 3 bolts. Torque: 12 N·m {117 kgf·cm, 8 ft·lbf} 3. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH (See page 4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
Toyota Tundra Service Manual > Sfi System: Readiness Monitor Drive Pattern
READINESS MONITOR DRIVE PATTERN 1. PURPOSE OF READINESS TESTS The On-Board Diagnostic (OBD II) system is designed to monitor the performance of emission related components, and indicate any detected abnormalities with DTCs (Diagnostic Trouble Codes). Since various components need to be monitored dur ...