Toyota Tundra Service Manual: Installation

INSTALLATION

PROCEDURE

1. INSTALL STARTER ASSEMBLY

(a) Install the flywheel housing side cover.

(b) Install the starter with the 2 bolts.

Torque:

37 N·m {377 kgf·cm, 27 ft·lbf}

(c) Connect the starter wire with the nut.

Torque:

9.8 N·m {100 kgf·cm, 87 in·lbf}

(d) Connect the starter connector.

(e) Attach the 2 wire harness clamps.

2. INSTALL STARTER COVER

(a) Install the starter cover with the 3 bolts.

Torque:

12 N·m {117 kgf·cm, 8 ft·lbf}

3. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH

(See page )

4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Inspection

    Reassembly

    See More:

    Toyota Tundra Service Manual > Air Conditioning System(for Automatic Air Conditioning System): Terminals Of Ecu
    TERMINALS OF ECU 1. CHECK AIR CONDITIONING AMPLIFIER (a) Measure the voltage and resistance according to the value(s) in the table below. HINT: Check from the rear of the connector with it connected to the air conditioning amplifier. Terminal No. (Symbols) Wiring Color Terminal Description Condition ...

    Toyota Tundra Owners Manual

    Toyota Tundra Service Manual

    © 2026 Copyright www.ttundra.com
    0.0309