ADJUSTMENT PROCEDURE 1. ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY (a) Loosen the bolt of the park/neutral position switch and move the shift lever to N. (b) Align the groove with the neutral basic line. (c) Hold the switch in position and tighten the bolt. Torque: 13 N·m {130 kgf·cm, 9 ft·lbf} (d) After the adjustment, perform the on-vehicle inspection (See page
|
Toyota Tundra Service Manual > Front Bumper: Installation
INSTALLATION PROCEDURE 1. INSTALL FRONT BUMPER END RETAINER LH (a) Install the front bumper end retainer LH with the 3 nuts. Torque: 5.4 N·m {55 kgf·cm, 48 in·lbf} 2. INSTALL FRONT BUMPER END RETAINER RH HINT: Use the same procedure described for the LH side. 3. INSTALL FRONT BUMPER SIDE SUPPORT ...