Toyota Tundra Service Manual: Installation

INSTALLATION

PROCEDURE

1. INSTALL COLUMN SHIFT ASSEMBLY

(a) Using a T30 "TORX" wrench, install the column shift with the 3 bolts.

Torque:

4.0 N·m {41 kgf·cm, 35 in·lbf}

(b) Connect the connector and attach the harness clamp.

(c) Connect the column shift transmission control cable end to the column shift.

NOTICE:

Make sure to connect the cable end so that the inner cable is not twisted. Confirm that the ridged side of the cable end is facing upward.

2. ADJUST SHIFT LEVER POSITION

3. INSTALL TURN SIGNAL SWITCH ASSEMBLY WITH SPIRAL CABLE SUB-ASSEMBLY

(See page )

4. INSPECT SHIFT LEVER POSITION

    Inspection

    On-vehicle Inspection

    See More:

    Toyota Tundra Service Manual > Power Mirror Control System(w/ Memory): Power Mirrors do not Return to Memorized Position
    DESCRIPTION If any of the M1 or M2 seat memory switch is pressed, the outer mirror control ECU assembly LH detects the switch operation and sends the seat memory switch signal to the main body ECU (multiplex network body ECU) via CAN communication. The main body ECU (multiplex network body ECU) send ...

    Toyota Tundra Owners Manual

    Toyota Tundra Service Manual

    © 2025 Copyright www.ttundra.com
    0.0128