INSTALLATION PROCEDURE 1. INSTALL REAR DIFFERENTIAL CARRIER ASSEMBLY
(b) Install a new gasket and the differential carrier with the 10 washers and 10 nuts. Torque: 72 N·m {734 kgf·cm, 53 ft·lbf} NOTICE: Be careful not to damage the contact surfaces of the differential carrier and rear axle housing. 2. INSTALL REAR AXLE SHAFT LH (a) Install the rear axle shaft LH (See page
3. INSTALL REAR AXLE SHAFT RH HINT: Use the same procedure described for the LH side. 4. INSTALL PROPELLER SHAFT ASSEMBLY (a) Install the propeller shaft for 2WD (See page
(b) Install the propeller shaft for 4WD (See page
5. ADD DIFFERENTIAL OIL
6. INSTALL REAR WHEEL (a) Install the rear wheels. Torque: for aluminum wheel : 131 N·m {1336 kgf·cm, 97 ft·lbf} for steel wheel : 209 N·m {2131 kgf·cm, 154 ft·lbf} |
Toyota Tundra Service Manual > 1ur-fe Starting: Starter Relay
On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. REMOVE STARTER RELAY (ST) (a) Remove the engine room relay box cover. (b) Remove the starter relay from the engine room relay block. 2. INSPECT STARTER RELAY (a) Measure the resistance according to the value(s) in the table below. Standard Res ...