INSTALLATION PROCEDURE 1. INSTALL VANE PUMP ASSEMBLY HINT: Before performing the following procedures, move the spacer until the vane pump can be installed. ![]()
2. CONNECT PRESSURE FEED TUBE
(b) Install the pressure feed tube with the union bolt. Torque: 51 N·m {520 kgf·cm, 38 ft·lbf} 3. CONNECT POWER STEERING OIL PRESSURE SENSOR CONNECTOR
4. CONNECT NO. 1 OIL RESERVOIR TO PUMP HOSE
5. CONNECT WIRE HARNESS CLAMP
6. INSTALL FAN AND GENERATOR V BELT 7. INSTALL AIR CLEANER ASSEMBLY 8. INSTALL V-BANK COVER SUB-ASSEMBLY 9. ADD POWER STEERING FLUID 10. BLEED POWER STEERING FLUID
11. INSPECT FOR POWER STEERING FLUID LEAK 12. INSTALL NO. 1 ENGINE UNDER COVER 13. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTICE: Some systems need to be initialized after the cable is reconnected (See page
|
Toyota Tundra Owners Manual > Adjusting the steering
wheel and mirrors: Steering wheel
Adjustment procedure (manually adjustable type) 1. Hold the steering wheel and push the lever down. Vehicles with front bench type seat 2. Adjust to the ideal position by moving the steering wheel. After adjustment, pull the lever up to secure the steering wheel. Vehicles with front separate type se ...