INSTALLATION PROCEDURE 1. INSTALL VANE PUMP ASSEMBLY HINT: Before performing the following procedures, move the spacer until the vane pump can be installed.
2. CONNECT PRESSURE FEED TUBE
(b) Install the pressure feed tube with the union bolt. Torque: 51 N·m {520 kgf·cm, 38 ft·lbf} 3. CONNECT POWER STEERING OIL PRESSURE SENSOR CONNECTOR
4. CONNECT NO. 1 OIL RESERVOIR TO PUMP HOSE
5. CONNECT WIRE HARNESS CLAMP
6. INSTALL FAN AND GENERATOR V BELT 7. INSTALL AIR CLEANER ASSEMBLY 8. INSTALL V-BANK COVER SUB-ASSEMBLY 9. ADD POWER STEERING FLUID 10. BLEED POWER STEERING FLUID
11. INSPECT FOR POWER STEERING FLUID LEAK 12. INSTALL NO. 1 ENGINE UNDER COVER 13. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTICE: Some systems need to be initialized after the cable is reconnected (See page
|
Toyota Tundra Service Manual > Front Shock Absorber: Installation
INSTALLATION CAUTION / NOTICE / HINT HINT: Use the same procedures for the RH side and LH side. The procedures listed below are for the LH side. A bolt without a torque specification is shown in the standard bolt chart (see page ). PROCEDURE 1. TEMPORARILY INSTALL FRONT SHOCK ABSORBER WITH COIL SPRI ...