REASSEMBLY PROCEDURE 1. INSTALL REAR BUMPER UPPER COVER LH (a) Install the rear bumper upper cover LH with the 2 nuts. Torque: 30 N·m {306 kgf·cm, 22 ft·lbf} 2. INSTALL REAR BUMPER UPPER COVER RH HINT: Use the same procedure described for the LH side. 3. INSTALL REAR BUMPER BAR LH (a) Install the rear bumper bar LH with the 5 bolts. Torque: 30 N·m {306 kgf·cm, 22 ft·lbf} 4. INSTALL REAR BUMPER BAR RH HINT: Use the same procedure described for the LH side. 5. INSTALL REAR BUMPER PLATE (a) Install the rear bumper plate with the 2 bolts. Torque: 30 N·m {306 kgf·cm, 22 ft·lbf} 6. INSTALL NO. 2 FRAME WIRE (a) w/ Towing Package: (1) Attach all the clamps to install the No. 2 frame wire to the receiver hitch bracket sub-assembly. (b) w/o Towing Package: (1) Attach all the clamps to install the No. 2 frame wire to the rear bumper reinforcement sub-assembly. 7. INSTALL NO. 3 ULTRASONIC SENSOR (w/ Intuitive Parking Assist System)
8. INSTALL NO. 2 ULTRASONIC SENSOR RETAINER (w/ Intuitive Parking Assist System)
9. INSTALL NO. 2 ULTRASONIC SENSOR (w/ Intuitive Parking Assist System)
10. INSTALL REAR BUMPER BAR CORNER REINFORCEMENT LH (a) Install the rear bumper bar corner reinforcement LH with the 5 bolts. Torque: 30 N·m {306 kgf·cm, 22 ft·lbf} 11. INSTALL REAR BUMPER BAR CORNER REINFORCEMENT RH HINT: Use the same procedure described for the LH side. 12. INSTALL LICENSE PLATE LIGHT ASSEMBLY LH
13. INSTALL LICENSE PLATE LIGHT ASSEMBLY RH HINT: Use the same procedure described for the LH side. 14. INSTALL REAR BUMPER PAD SUB-ASSEMBLY LH (a) Attach the 12 claws and 2 guides to install a new rear bumper pad sub-assembly LH. (b) Install the 3 clips. 15. INSTALL REAR BUMPER PLATE LH (a) Attach the 3 claws and clip to install a new rear bumper plate LH. 16. INSTALL REAR BUMPER PLATE RH HINT: Use the same procedure described for the LH side. |
Toyota Tundra Service Manual > Oil Pump: Installation
INSTALLATION PROCEDURE 1. INSTALL WATER INLET PIPE (a) Apply soapy water to 2 new O-rings and install them to the water inlet pipe. (b) Install the water inlet pipe to the No. 1 heat exchanger cover. 2. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY (a) Apply a light coat of engine oil to a new oil pump ga ...