ON-VEHICLE INSPECTION PROCEDURE 1. INSPECT AIR PUMP ASSEMBLY (a) Start the engine and warm it up. (b) Turn the ignition switch off.
(d) Connect the Techstream to the DLC3. (e) Turn the ignition switch to ON and turn the Techstream on. (f) Enter the following menus: Powertrain / Engine and ECT / Utility / Secondary Air Injection Check / Manual Mode / AIR PUMP 1: ON, ASV1: OPEN, AIR PUMP 2: ON, ASV2: OPEN. HINT: When Manual Mode is selected, the Techstream initialization (atmospheric pressure measurement) is performed automatically. The initialization takes 10 seconds. After the initialization, AIR PUMP and ASV operation can be selected. (g) Measure the current while the air pump assembly is turning. Standard Current:
(h) Turn the ignition switch to off. NOTICE:
|
Toyota Tundra Service Manual > Can Communication System: Check Bus 4 Line for Short to +B
DESCRIPTION There may be a short circuit between one of the CAN bus lines and +B when there is no resistance between terminal 22 (CA2H) of the central gateway ECU (network gateway ECU) and terminal 16 (BAT) of the DLC3, or terminal 7 (CA2L) of the central gateway ECU (network gateway ECU) and termin ...