Toyota Tundra Service Manual: Removal

REMOVAL

PROCEDURE

1. DISCONNECT NO. 2 AIR HOSE

(a) Disconnect the air switching valve assembly connector.

(b) Slide the clamp and disconnect the No. 2 air hose.

2. REMOVE AIR SWITCHING VALVE ASSEMBLY

(a) Remove the bolt and disconnect the wire harness clamp bracket from the cylinder head cover.

(b) Remove the 2 bolts.

(c) Remove the 3 bolts, air switching valve assembly and gasket.

NOTICE:

Be careful not to damage the installation surface of the gaskets.

    Installation

    Air Switching Valve(for Bank 2)

    See More:

    Toyota Tundra Service Manual > Cylinder Head: Reassembly
    REASSEMBLY PROCEDURE 1. INSTALL STUD BOLT (a) Using E7 and E8 "TORX" socket wrenches, install the stud bolts. Torque: for stud bolts A, B, C, D : 9.0 N·m {92 kgf·cm, 80 in·lbf} 2. INSTALL NO. 2 STRAIGHT SCREW PLUG (a) Using a 14 mm hexagon wrench, install 2 new gaskets and the 2 straight screw pl ...

    Toyota Tundra Owners Manual

    Toyota Tundra Service Manual

    © 2026 Copyright www.ttundra.com
    0.0138