Toyota Tundra Service Manual: Installation

INSTALLATION

PROCEDURE

1. INSTALL AIR SWITCHING VALVE ASSEMBLY

(a) Install a new gasket and the air switching valve assembly with the 3 bolts.

Torque:

24 N·m {245 kgf·cm, 18 ft·lbf}

Text in Illustration

*1

Air Switching Valve Assembly

*2

No. 4 Air Tube

*a

Claw

NOTICE:

Make sure the gasket's claws are not caught between the air switching valve assembly and No. 4 air tube.

(b) Install the 2 bolts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(c) Connect the wire harness clamp bracket to the cylinder head cover sub-assembly LH with the bolt.

Torque:

8.0 N·m {82 kgf·cm, 71 in·lbf}

2. CONNECT NO. 2 AIR HOSE

(a) Align the paint mark with the projection and connect the No. 2 air hose, and slide the clamp to secure the hose.

Text in Illustration

*a

Paint Mark

*b

Projection

HINT:

Make sure the direction of the hose clamp is as shown in the illustration.

(b) Connect the air switching valve assembly connector.

    Inspection

    Removal

    See More:

    Toyota Tundra Service Manual > Audio And Visual System: No Sound can be Heard from Speakers
    PROCEDURE 1. CHECK RADIO AND DISPLAY RECEIVER ASSEMBLY (a) In sound output setting mode, set volume, fader and balance to the initial values and check that the sound is normal. OK: Audio and visual system returns to normal. OK END (SETTINGS ARE DEFECTIVE) NG PROCEED TO NEXT SUSPECTED AREA SHOWN IN P ...

    Toyota Tundra Owners Manual

    Toyota Tundra Service Manual

    © 2023 Copyright www.ttundra.com
    0.0194