INSPECTION PROCEDURE 1. INSPECT AIR SWITCHING VALVE ASSEMBLY
(b) Check the operation of the air switching valve assembly. (1) Check that air does not flow from port A to port B. Text in Illustration
NOTICE: Make sure the applied pressure is 30 kPa (0.3 kgf/cm2, 4.4 psi) or less. If the result is not as specified, replace the air switching valve assembly. (2) Apply battery voltage across terminals 1 and 5. Text in Illustration
NOTICE: When applying voltage, do not touch terminals 2, 3 or 4. (3) Check that air flows from port A to port B. If the result is not as specified, replace the air switching valve assembly. |
Toyota Tundra Service Manual > Front Passenger Side Knee Airbag Assembly: Disposal
DISPOSAL CAUTION / NOTICE / HINT CAUTION: Before performing pre-disposal deployment of any SRS component, review and closely follow all applicable environmental and hazardous material regulations. Pre-disposal deployment may be considered hazardous material treatment. PROCEDURE 1. PRECAUTION CAUTION ...