INSPECTION PROCEDURE 1. INSPECT FRONT NO. 1 SUSPENSION ARM LOWER SUB-ASSEMBLY LH (a) As shown in the illustration, move the ball joint stud back and forth 5 times before installing the nut. (b) Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per turn and take the torque reading on the fifth turn. Standard turning torque: 3.0 to 10.0 N*m (31 to 102 kgf*cm, 27 to 89 in.*lbf) (c) Check for any cracks and grease leaks on the ball joint dust cover. |
Toyota Tundra Service Manual > Airbag System: Short in Curtain Shield Airbag (RH) Squib Circuit (B1830-B1833)
DESCRIPTION The curtain shield squib RH circuit consists of the airbag sensor assembly and curtain shield airbag assembly RH. The circuit instructs the SRS to deploy when deployment conditions are met. These DTCs are stored when a malfunction is detected in the curtain shield squib RH circuit. DTC N ...