REASSEMBLY PROCEDURE 1. INSTALL FRONT UPPER BALL JOINT DUST COVER LH (a) Pack the upper arm ball joint with MP grease. Grease capacity: 5.0 to 7.0 g (0.176 to 0.247 oz.)
2. INSTALL FRONT SUSPENSION UPPER ARM BUSH (a) Using SST and a press, press in a new bush. SST: 09710-26011 09710-05061 |
Toyota Tundra Service Manual > Automatic Transmission System: Shift Solenoid "E" Control Circuit Low (Shift Solenoid Valve SR) (P0985,P0986)
DESCRIPTION Shifting from 1st to 6th is performed in combination with ON and OFF operation of the shift solenoid valves SL1, SL2, S1, S2, S3, S4 and SR, which are controlled by the ECM. If an open or short circuit occurs in any of the shift solenoid valves, the ECM controls the remaining normal shif ...