REASSEMBLY PROCEDURE 1. INSTALL FRONT UPPER BALL JOINT DUST COVER LH (a) Pack the upper arm ball joint with MP grease. Grease capacity: 5.0 to 7.0 g (0.176 to 0.247 oz.)
2. INSTALL FRONT SUSPENSION UPPER ARM BUSH (a) Using SST and a press, press in a new bush. SST: 09710-26011 09710-05061 |
Toyota Tundra Service Manual > Differential Carrier Assembly(for 3ur-fe, 3ur-fbe): Reassembly
REASSEMBLY PROCEDURE 1. INSTALL DIFFERENTIAL CASE ASSEMBLY (a) Install the 2 side gear thrust washers to the side gears. (b) Install the 2 side gears with the thrust washers, 2 pinion gears, 2 pinion gear thrust washers and pinion shaft. HINT: Align the straight pin holes of the differential case an ...