REASSEMBLY PROCEDURE 1. INSTALL FRONT UPPER BALL JOINT DUST COVER LH (a) Pack the upper arm ball joint with MP grease. Grease capacity: 5.0 to 7.0 g (0.176 to 0.247 oz.)
2. INSTALL FRONT SUSPENSION UPPER ARM BUSH (a) Using SST and a press, press in a new bush. SST: 09710-26011 09710-05061 |
Toyota Tundra Service Manual > Door Control Switch(for Front Lh): Inspection
INSPECTION PROCEDURE 1. INSPECT POWER WINDOW REGULATOR MASTER SWITCH ASSEMBLY (DOOR CONTROL SWITCH ASSEMBLY) (for Regular Cab) (a) Measure the resistance according to the value(s) in the table below. Standard resistance: Tester Connection Switch Condition Specified Condition 1 (L) - 7 (E) Lock Below ...