Components COMPONENTS ILLUSTRATION Inspection INSPECTION PROCEDURE 1. INSPECT TRANSFER SHIFT ACTUATOR ASSEMBLY (a) Measure the resistance according to the value(s) in the table below. (1) Connect the connectors to the vehicle side wire harnesses, operate the motor, and then measure the resistance at each position. Standard Resistance:
Installation INSTALLATION CAUTION / NOTICE / HINT NOTICE: Change the vehicle to 2WD mode before removing the transfer shift actuator assembly. If the vehicle cannot be changed to 2WD mode, since the new transfer shift actuator assembly is set in the 2WD position, connect all the connectors to the vehicle side wire harnesses to set the new transfer shift actuator assembly to the drive state of the vehicle before installing the new transfer shift actuator assembly. PROCEDURE 1. INSTALL TRANSFER SHIFT ACTUATOR ASSEMBLY
(b) Install the transfer shift actuator assembly with the 4 bolts. Torque: 9.5 N·m {97 kgf·cm, 84 in·lbf} NOTICE: Tighten the bolts of the transfer shift actuator assembly within 10 minutes of applying the seal packing. The seal packing will dry very quickly. (c) Connect the 3 connectors and attach the 2 clamps. Removal REMOVAL CAUTION / NOTICE / HINT NOTICE: Change the vehicle to 2WD mode before removing the transfer shift actuator assembly. If the vehicle cannot be changed to 2WD mode, since the new transfer shift actuator assembly is set in the 2WD position, connect all the connectors to the vehicle side wire harnesses to set the new transfer shift actuator assembly to the drive state of the vehicle before installing the new transfer shift actuator assembly. PROCEDURE 1. REMOVE TRANSFER SHIFT ACTUATOR ASSEMBLY
(b) Remove the 4 bolts and transfer shift actuator assembly. |
Toyota Tundra Service Manual > Canister: Inspection
INSPECTION PROCEDURE 1. INSPECT CHARCOAL CANISTER ASSEMBLY (a) Visually check the charcoal canister assembly for cracks or damage. If cracks or damage are found, replace the charcoal canister assembly. (b) Check charcoal canister assembly operation. (1) With the purge port closed, blow 5 kPa (0.1 kg ...