INSPECTION PROCEDURE 1. INSPECT TIE ROD END SUB-ASSEMBLY LH
(b) Install the nut to the stud bolt. (c) Flip the ball joint back and forth 5 times or more. (d) Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per turn and take the torque reading on the fifth turn. Standard turning torque: 1.0 to 3.9 N*m (10 to 40 kgf*cm, 9 to 34 in.*lbf) If turning torque is not within the specified range, replace the tie rod end LH. 2. INSPECT TIE ROD END SUB-ASSEMBLY RH HINT: Use the same procedures described for the LH side. |
Toyota Tundra Service Manual > Pre-collision System Warning Buzzer: Inspection
INSPECTION PROCEDURE 1. INSPECT SKID CONTROL BUZZER ASSEMBLY (a) Make sure that there is no looseness in the locking part and connecting part of the connector. (b) Disconnect the skid control buzzer connector. (c) Check the connector and terminals for deformation and corrosion. OK: No deformation or ...