INSPECTION PROCEDURE 1. INSPECT TIE ROD END SUB-ASSEMBLY LH
(b) Install the nut to the stud bolt. (c) Flip the ball joint back and forth 5 times or more. (d) Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per turn and take the torque reading on the fifth turn. Standard turning torque: 1.0 to 3.9 N*m (10 to 40 kgf*cm, 9 to 34 in.*lbf) If turning torque is not within the specified range, replace the tie rod end LH. 2. INSPECT TIE ROD END SUB-ASSEMBLY RH HINT: Use the same procedures described for the LH side. |
Toyota Tundra Service Manual > Airbag System: Short in P/T Squib (LH) Circuit (B1905-B1908)
DESCRIPTION The front pretensioner LH circuit consists of the airbag sensor assembly and front seat outer belt assembly LH. This circuit instructs the SRS to deploy when deployment conditions are met. These DTCs are stored when a malfunction is detected in the front pretensioner LH circuit. DTC No. ...