Toyota Tundra Service Manual: Inspection

INSPECTION

PROCEDURE

1. INSPECT TIE ROD END SUB-ASSEMBLY LH

(a) Secure the tie rod end LH in a vise.

(b) Install the nut to the stud bolt.

(c) Flip the ball joint back and forth 5 times or more.

(d) Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per turn and take the torque reading on the fifth turn.

Standard turning torque:

1.0 to 3.9 N*m (10 to 40 kgf*cm, 9 to 34 in.*lbf)

If turning torque is not within the specified range, replace the tie rod end LH.

2. INSPECT TIE ROD END SUB-ASSEMBLY RH

HINT:

Use the same procedures described for the LH side.

    Disassembly

    Installation

    See More:

    Toyota Tundra Service Manual > Air Switching Valve(for Bank 1): Removal
    REMOVAL PROCEDURE 1. DISCONNECT NO. 2 AIR HOSE (a) Disconnect the air switching valve assembly connector. (b) Slide the clamp and disconnect the No. 2 air hose. 2. REMOVE AIR SWITCHING VALVE ASSEMBLY (a) Remove the bolt and disconnect the wire harness clamp bracket from the cylinder head cover. (b) ...

    Toyota Tundra Owners Manual

    Toyota Tundra Service Manual

    © 2026 Copyright www.ttundra.com
    0.0182