INSTALLATION PROCEDURE 1. INSTALL RADIATOR GRILLE SUB-ASSEMBLY (a) Attach the 4 claws and 3 clips to install the radiator grille sub-assembly. (b) Install the 4 screws and 2 clips. (c) w/ Toyota Safety Sense P: (1) Connect the millimeter wave radar sensor connector. 2. INSTALL RADIATOR SIDE GRILLE LH (a) Attach the 2 claws and 3 guides to install the radiator side grille LH. |
Toyota Tundra Service Manual > Steering Column Assembly(for Power Tilt And Power Telescopic Steering Column): Installation
INSTALLATION PROCEDURE 1. INSTALL STEERING COLUMN ASSEMBLY (a) Install the steering column with the bolt and 2 nuts. Torque: 21 N·m {214 kgf·cm, 15 ft·lbf} 2. INSTALL NO. 2 STEERING INTERMEDIATE SHAFT SUB-ASSEMBLY (a) Align the matchmarks on the No. 2 steering intermediate shaft and power steerin ...