INSTALLATION CAUTION / NOTICE / HINT HINT:
PROCEDURE 1. INSTALL FOG LIGHT ASSEMBLY LH (a) for Type A: (1) Attach the 2 guides to set the fog light assembly LH. (2) Install the screw. (b) for Type B: (1) Attach the 2 guides and claw to set the fog light assembly LH. (2) Install the screw.
2. INSTALL FRONT BUMPER ASSEMBLY (See page 3. ADJUST FOG LIGHT AIMING (See page |
Toyota Tundra Service Manual > Air Switching Valve(for Bank 2): Installation
INSTALLATION PROCEDURE 1. INSTALL AIR SWITCHING VALVE ASSEMBLY (a) Install a new gasket and the air switching valve assembly with the 3 bolts. Torque: 24 N·m {245 kgf·cm, 18 ft·lbf} Text in Illustration *1 Air Switching Valve Assembly *2 No. 3 Air Tube *a Claw NOTICE: Make sure the gasket's claws ...