INSTALLATION PROCEDURE 1. INSTALL CURTAIN SHIELD AIRBAG ASSEMBLY (a) Install the curtain shield airbag with the 8 bolts.
Torque: 11 N·m {112 kgf·cm, 8 ft·lbf} NOTICE: Do not twist the curtain shield airbag when installing it. (b) Connect the connector. NOTICE: When handling the airbag connector, take care not to damage the airbag wire harness. 2. INSTALL ROOF HEADLINING ASSEMBLY Click here 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Click here 4. CHECK SRS WARNING LIGHT Click here |
Toyota Tundra Service Manual > Can Communication System: Check Bus 5 Line for Short to GND
DESCRIPTION There may be a short circuit between one of the CAN bus lines and GND when there is no resistance between terminal 15 (CA5H) of the central gateway ECU (network gateway ECU) and terminal 4 (CG) of the DLC3, or terminal 16 (CA5L) of the central gateway ECU (network gateway ECU) and termin ...