INSTALLATION PROCEDURE 1. INSTALL CURTAIN SHIELD AIRBAG ASSEMBLY (a) Install the curtain shield airbag with the 8 bolts.
Torque: 11 N·m {112 kgf·cm, 8 ft·lbf} NOTICE: Do not twist the curtain shield airbag when installing it. (b) Connect the connector. NOTICE: When handling the airbag connector, take care not to damage the airbag wire harness. 2. INSTALL ROOF HEADLINING ASSEMBLY Click here 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Click here 4. CHECK SRS WARNING LIGHT Click here |
Toyota Tundra Service Manual > Sfi System: Bank 1 Air-Fuel Ratio Imbalance (P219A-P219F,P21A0-P21A3)
DESCRIPTION Refer to DTC P0300 (See page ). Refer to DTC P2195 (See page ). Refer to DTC P2197 (See page ). DTC No. DTC Detection Condition Trouble Area P219A The difference in air fuel ratios between the cylinders exceeds the threshold (2 trip detection logic). Fuel injector assembly Intake system ...