Components COMPONENTS ILLUSTRATION ![]()
Installation INSTALLATION PROCEDURE 1. INSTALL REAR CRANKSHAFT OIL SEAL (a) Apply MP grease to the lip of a new oil seal.
2. INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY
3. INSTALL AUTOMATIC TRANSMISSION ASSEMBLY (a) for 2WD: Refer to the following procedures (See page
(b) for 4WD: Refer to the following procedures (See page
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Removal REMOVAL PROCEDURE 1. PRECAUTION NOTICE: After
turning the ignition switch off, waiting time may be required before
disconnecting the cable from the battery terminal. Therefore, make sure
to read the disconnecting the cable from the battery terminal notice
before proceeding with work (See page 2. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL 3. REMOVE AUTOMATIC TRANSMISSION ASSEMBLY (a) for 2WD: Refer to the following procedures (See page
(b) for 4WD: Refer to the following procedures (See page
4. REMOVE DRIVE PLATE AND RING GEAR SUB-ASSEMBLY 5. REMOVE REAR CRANKSHAFT OIL SEAL (a) Using a knife, cut off the lip of the oil seal.
|
Toyota Tundra Service Manual > Vane Pump(for 1ur-fe): Installation
INSTALLATION PROCEDURE 1. INSTALL VANE PUMP ASSEMBLY HINT: Before performing the following procedures, move the spacer until the vane pump can be installed. Text in Illustration *a Spacer (a) Install the vane pump assembly with the 2 bolts. Torque: 28 N·m {286 kgf·cm, 21 ft·lbf} 2. INSTALL PRESSU ...